
Distributed solar procurement
The China Tower procurement platform published ranked candidates on 10 October for a second tender, GPDI-BF-2026-05398(2), in Heilongjiang. Evaluation began on 9 October. Zhongtong Construction ranked first in lot 1 and China Communications Construction Fourth Engineering Bureau in lot 2. Objections are accepted through 13 October.
These are candidates, not final contracts. The notice does not verify placed orders, installed capacity, generation or a total monetary project value. Percentage bid discounts are not contract amounts. The repeat-tender label does not establish why the prior tender was repeated.
Record AMU-20261011-001 counts two lots at the candidate stage. It was published on 10 October and first seen on 11 October; the final decision date is unknown. This is an administrative procurement indicator, not an increase in operating generation. Model parameters and calibration are unchanged. Final awards, contracts, orders, sites, capacity and commissioning require further checks. Hidden coordination is unestablished.